Independent Electrical Contractors (IEC) Year 4 Practice Exam 2026 - Free Electrical Contractor Practice Questions and Study Guide

Session length

1 / 20

In a 208/120 V, 3-phase, 4-wire system, what is the voltage between the neutral and the ground?

120

0

In a 208/120 V, 3-phase, 4-wire system, the neutral is the center point of the star-connected windings and is bonded to earth ground at the service equipment. Because neutral and ground are tied together at that single point, they sit at the same electrical potential during normal operation. So the voltage between neutral and ground is zero.

Remember: line-to-neutral voltage is 120 V, line-to-line is 208 V in this system, and 277 V would be the line-to-neutral voltage for a 480Y/277 V system, not this one.

208

277

Next question

Find the option that is right for you!

All options are one-time payments.

$12.50

30 day premium pass

All the basics to get you started

  • Ad-free experience
  • View your previous attempt history
  • Mobile app access
  • In-depth explanations
  • 30 day premium pass access
👑$30.00 $87.50 usd

6 month DELUXE pass (most popular)

Everything with the 30 day premium pass FOR 6 MONTHS! & the ultimate digital PDF study guide (BONUS)

  • Everything included in the premium pass
  • $87.50 usd value for $30.00! You save $57.50!
  • + Access to the ultimate digital PDF study guide
  • + 6 months of premium pass access
  • + Priority support
$12.50 $18.99

Ultimate digital PDF study guide

For those that prefer a more traditional form of learning

  • Available for instant download
  • Available offline
  • Hundreds of practice multiple choice questions
  • Comprehensive content
  • Detailed explanations
Image Description
Subscribe

Get the latest from Examzify

You can unsubscribe at any time. Read our privacy policy